Datacenter IBO
Datacenter IBO is an operational data center operated by IBO in Clermont-Ferrand, France. Our footprint estimate of its power is about 1.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | IBO |
| Facility power | 1.7 MW (range 0.9 MW to 2.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,456 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 730 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 45.78410, 3.13083 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datacenter IBO use?
We estimate the facility power at about 1.7 MW. Estimate from building footprint, low confidence.
Who operates Datacenter IBO?
IBO.
Data centers near Clermont-Ferrand
- Datacenter IBM 2.8 km · 4.2 MW
- RTDC 2.8 km
- Centre Régional de Ressources Informatiques (CRRI) 2.9 km · 2.7 MW
- O2Switch DC2 3.1 km · 2.6 MW
- Nexeren CBZ 5.4 km · 0.9 MW
- DC Free 5.5 km · 1.5 MW
- Datacenter IBM 5.8 km · 2.3 MW
- MXTL1 50.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.