Data Center GTD

Data Center GTD is an operational data center operated by GTD in Renca, Chile. Our footprint estimate of its power is about 3.1 MW.

Key facts

StatusOperational
OperatorGTD
Facility power3.1 MW (range 1.2 MW to 7.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 25,633 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressAvenida Presidente Eduardo Frei Montalva 3615
Coordinates-33.39740, -70.68379
Websitegtd.cl

Satellite view

Questions

How much power does Data Center GTD use?

We estimate the facility power at about 3.1 MW. Estimate from building footprint, low confidence.

Who operates Data Center GTD?

GTD.