Data center in Donaustadt
Data center in Donaustadt is an operational data center in Donaustadt, Austria. Our footprint estimate of its power is about 2.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.1 MW (range 0.8 MW to 5.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,344 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.23171, 16.46218 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Donaustadt use?
We estimate the facility power at about 2.1 MW. Estimate from building footprint, low confidence.
Data centers near Donaustadt
- Raiffeisen Informatik Data Center (RDC) 305 m
- Vienna International Center 3.3 km
- ODC21 (IBM colocation site) 4.9 km
- AtlasEdge DC Vienna VIE002 4.9 km
- A1 Next Generation Datacenter 4.9 km · 4.8 MW
- AtlasEdge DC Vienna VIE001 4.9 km
- ATOS Datacenter Siemens City 5.1 km
- Austria Campus 5.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.