A1 Next Generation Datacenter
A1 Next Generation Datacenter is an operational data center in Wien, Austria. Our footprint estimate of its power is about 4.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.8 MW (range 2.4 MW to 7.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,024 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Paukerwerkstraße 7, 1210, Wien |
| Coordinates | 48.27030, 16.43036 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does A1 Next Generation Datacenter use?
We estimate the facility power at about 4.8 MW. Estimate from building footprint, low confidence.
Data centers near Wien
- ODC21 (IBM colocation site) 201 m
- ATOS Datacenter Siemens City 592 m
- AtlasEdge DC Vienna VIE001 769 m
- AtlasEdge DC Vienna VIE002 936 m
- Digital Realty VIE1/2 - Vienna 1.5 km · 36 MW
- ÖBB Telekom Service Datacenter 2.5 km
- Florido Tower 2.8 km
- Vienna International Center 4.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.