Data center in Bet Shemesh
Data center in Bet Shemesh is an operational data center in Bet Shemesh, Israel. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 17 MW (range 8.6 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,342 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.77179, 34.99240 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Bet Shemesh use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
Data centers near Bet Shemesh
- NVIDIA Israel-1 16.5 km · 2.9 MW
- SDS1 Modiin 16.5 km
- רד תקשורת מחשבים 21.1 km · 6 MW
- Partner Rehovot DataCenter 23.4 km
- MTIT Building 01 26.5 km
- Data center in Shoham 27.8 km · 9.1 MW
- Bezeq International Shacham Data Center 37.0 km
- Bezeq International Afek Data Center 37.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.