Data center in Shoham is an operational data center in Shoham, Israel. Our footprint estimate of its power is about 9.1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 9.1 MW (range 4.5 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,577 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 32.02059, 34.96026 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Shoham use?
We estimate the facility power at about 9.1 MW. Estimate from building footprint, low confidence.
Data centers near Shoham
- Bezeq International Afek Data Center 9.8 km
- Adgar Partner 9.9 km
- SDS1 Modiin 11.4 km
- SDS4 Petch Tikva 11.8 km
- Bezeq International Shacham Data Center 12.0 km
- EdgeConneX Tel Aviv (EDCTLV11) 12.2 km
- Bezeq International Sivim Data Center 12.4 km
- MedOne PT1 (Petach Tikva) 12.4 km