Data Center Directory

CyrusOne London 4

CyrusOne London 4 is an operational data center operated by CyrusOne in Slough, United Kingdom. Our footprint estimate of its power is about 22 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power22 MW (range 11 MW to 35 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 18,040 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 9,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asCyrusOne London 5 · CryrusOne LON4 · CryrusOne LON5
Address225 Bath Rd
Coordinates51.51677, -0.62756
Websitecyrusone.com/locations/united-kingdom/london-iv

Satellite view

Questions

How much power does CyrusOne London 4 use?

We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.

Who operates CyrusOne London 4?

CyrusOne.

Data centers near Slough

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.