Data Center Directory

CoreSite - Santa Clara (SV7)

CoreSite - Santa Clara (SV7) is an operational data center operated by CoreSite in Santa Clara, United States. Our footprint estimate of its power is about 5.3 MW.

Key facts

StatusOperational
OperatorCoreSite
Facility power5.3 MW (range 2.6 MW to 8.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,406 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks20 networks, 2 internet exchanges
PeeringDB.
Also known asCoreSite SV7 · CoreSite SV6
Address3020 Coronado Drive
Coordinates37.37610, -121.97306
Websitecoresite.com

Satellite view

Questions

How much power does CoreSite - Santa Clara (SV7) use?

We estimate the facility power at about 5.3 MW. Estimate from building footprint, low confidence.

Who operates CoreSite - Santa Clara (SV7)?

CoreSite.

Data centers near Santa Clara

More CoreSite data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.