Data Center Directory

CoreSite - Chicago (CH2)

CoreSite - Chicago (CH2) is an operational data center operated by CoreSite in Chicago, United States. Our footprint estimate of its power is about 5.4 MW.

Key facts

StatusOperational
OperatorCoreSite
Facility power5.4 MW (range 2.7 MW to 8.7 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,523 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks15 networks, 2 internet exchanges
PeeringDB.
Also known asCoreSite Chicago Data Center (CH2)
Address1432 S. Clinton St
Coordinates41.86255, -87.64097
Websitecoresite.com

Satellite view

Questions

How much power does CoreSite - Chicago (CH2) use?

We estimate the facility power at about 5.4 MW. Estimate from building footprint, low confidence.

Who operates CoreSite - Chicago (CH2)?

CoreSite.

Data centers near Chicago

More CoreSite data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.