CloudDC
CloudDC is an operational data center operated by ООО ИК "Сибинтек" in Zelenograd, Russia. Our footprint estimate of its power is about 3.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | ООО ИК "Сибинтек" |
| Facility power | 3.3 MW (range 1.3 MW to 8.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 27,109 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 56.00968, 37.14911 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CloudDC use?
We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.
Who operates CloudDC?
ООО ИК "Сибинтек".
Data centers near Zelenograd
- GreenBushDC 841 m · 3 MW
- DATAPLANET datacenter 7.6 km
- Web Data Center 20.5 km
- DataLine Moscow 1 22.8 km
- DataPro Moscow II 22.9 km · 1.8 MW
- Data center in Novokhovrino 26.4 km · 3.1 MW
- NORD-4 26.5 km · 5.2 MW
- e-Style ISP LLC 30.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.