CloudDC

CloudDC is an operational data center operated by ООО ИК "Сибинтек" in Zelenograd, Russia. Our footprint estimate of its power is about 3.3 MW.

Key facts

StatusOperational
OperatorООО ИК "Сибинтек"
Facility power3.3 MW (range 1.3 MW to 8.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 27,109 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates56.00968, 37.14911

Satellite view

Questions

How much power does CloudDC use?

We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.

Who operates CloudDC?

ООО ИК "Сибинтек".