Data Center Directory

Centro de Procesamiento de Datos Sur

Centro de Procesamiento de Datos Sur is an operational data center operated by Banco Santander in El Astillero, Spain. Our footprint estimate of its power is about 7.3 MW.

Key facts

StatusOperational
OperatorBanco Santander
Facility power7.3 MW (range 3.6 MW to 12 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 6,071 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 3,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates43.39024, -3.75367

Satellite view

Questions

How much power does Centro de Procesamiento de Datos Sur use?

We estimate the facility power at about 7.3 MW. Estimate from building footprint, low confidence.

Who operates Centro de Procesamiento de Datos Sur?

Banco Santander.

Data centers near El Astillero

More Banco Santander data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.