Centro de Procesamiento de Datos Norte

Centro de Procesamiento de Datos Norte is an operational data center operated by Banco Santander in El Astillero, Spain. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorBanco Santander
Facility power12 MW (range 5.8 MW to 19 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,700 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates43.39284, -3.75323

Satellite view

Questions

How much power does Centro de Procesamiento de Datos Norte use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

Who operates Centro de Procesamiento de Datos Norte?

Banco Santander.