Bouygues Télécom data center in Loos
Bouygues Télécom data center in Loos is an operational data center operated by Bouygues Télécom in Loos, France. Our footprint estimate of its power is about 0.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bouygues Télécom |
| Facility power | 0.8 MW (range 0.4 MW to 1.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 702 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 340 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 50.61353, 3.02200 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bouygues Télécom data center in Loos use?
We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.
Who operates Bouygues Télécom data center in Loos?
Bouygues Télécom.
Data centers near Loos
- Oxya Datacenter 362 m · 2.5 MW
- UltraEdge Lille 1.8 km
- EXA Edge DC Sequedin 2.4 km
- TDF Datacenter Lille Lambersart 4.1 km
- TDF ProxiCenter Lille Lambersart 4.1 km · 4.5 MW
- Lille Boitelle 4.2 km
- Datacenter SNCF RESARAIL 4.8 km · 7.7 MW
- La Pointe 1 5.2 km · 13 MW
More Bouygues Télécom data centers
- Datacenter Bouygues Télécom France
- Datacenter Bouygues Télécom France
- Bouygues Telecom data center in Cabriès France
- Bouygues Télécom data center in Montpellier France
- Bouygues Télécom data center in Poitiers France
- Bouygues Télécom data center in Toulouse France
- Bouygues Télécom data center in Léognan France
- Bouygues Télécom data center in Nanterre France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.