Datacenter SNCF RESARAIL
Datacenter SNCF RESARAIL is an operational data center operated by SNCF in Lille, France. Our footprint estimate of its power is about 7.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | SNCF |
| Facility power | 7.7 MW (range 3.8 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,385 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 50.62286, 3.08838 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Datacenter SNCF RESARAIL use?
We estimate the facility power at about 7.7 MW. Estimate from building footprint, low confidence.
Who operates Datacenter SNCF RESARAIL?
SNCF.
Data centers near Lille
- Lille Boitelle 892 m
- Comarch Data Center 1.4 km · 3 MW
- Comarch France #1 1.5 km
- Cogent Lille 1.7 km · 1 MW
- dc2scale LIL1 (Lille Datacenter) 3.3 km
- UltraEdge Lille 3.9 km
- TDF Datacenter Lille Lambersart 4.2 km
- TDF ProxiCenter Lille Lambersart 4.4 km · 4.5 MW
More SNCF data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.