Data Center Directory

AirTrunk SYD1

AirTrunk SYD1 is a data center under construction operated by AirTrunk Operating in Huntingwood, Australia. Our footprint estimate of its power is about 25 MW.

Key facts

StatusUnder construction
OperatorAirTrunk Operating
Facility power25 MW (range 13 MW to 40 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 20,978 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 11,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks4 networks, 1 internet exchanges
PeeringDB.
Also known asAirTrunk SYD1 Sydney West · AirTrunk Stage 4
Address35 Huntingwood Drive
Coordinates-33.79952, 150.88157
Websiteairtrunk.com

Satellite view

Questions

How much power does AirTrunk SYD1 use?

We estimate the facility power at about 25 MW. Estimate from building footprint, low confidence.

Who operates AirTrunk SYD1?

AirTrunk Operating.

Data centers near Huntingwood

More AirTrunk Operating data centers

Sources

Correct this page or get the data