AirTrunk SYD1
AirTrunk SYD1 is a data center under construction operated by AirTrunk Operating in Huntingwood, Australia. Our footprint estimate of its power is about 25 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | AirTrunk Operating |
| Facility power | 25 MW (range 13 MW to 40 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,978 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 11,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks, 1 internet exchanges PeeringDB. |
| Also known as | AirTrunk SYD1 Sydney West · AirTrunk Stage 4 |
| Address | 35 Huntingwood Drive |
| Coordinates | -33.79952, 150.88157 |
| Website | airtrunk.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AirTrunk SYD1 use?
We estimate the facility power at about 25 MW. Estimate from building footprint, low confidence.
Who operates AirTrunk SYD1?
AirTrunk Operating.
Data centers near Huntingwood
- AirTrunk SYD1 Sydney West 125 m · 6.3 MW
- AirTrunk SYD3 Sydney West 572 m · 11 MW
- Sydney 01 760 m · 9.8 MW
- AWS Asia Pacific (Sydney) Region Data Centre 1.2 km · 14 MW
- AWS Asia Pacific (Sydney) Region Data Centre 4.1 km · 10 MW
- Data center in Minchinbury 4.2 km · 12 MW
- CDC Sydney EC1 4.5 km · 17 MW
- CDC Eastern Creek Campus EC4 4.6 km · 17 MW
More AirTrunk Operating data centers
- AirTrunk MEL1 Australia
- AirTrunk SGP1 Singapore
- AirTrunk HKG1 Hong Kong SAR China
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.