AINET - Beltsville is an operational data center operated by AiNET in Beltsville, United States. Our footprint estimate of its power is about 6.6 MW.

Key facts

StatusOperational
OperatorAiNET
Facility power6.6 MW (range 3.3 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,486 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks5 networks
PeeringDB.
Also known asAiNET WDC8
Address11700 Montgomery Rd
Coordinates39.05277, -76.92586
Websiteai.net

Satellite view

Questions

How much power does AINET - Beltsville use?

We estimate the facility power at about 6.6 MW. Estimate from building footprint, low confidence.

Who operates AINET - Beltsville?

AiNET.