Zummer - DataCenter
Zummer - DataCenter is an operational data center operated by Zummer in Tyumen, Russia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Zummer |
| Address | Molodezhnaya, 81 |
| Coordinates | 57.13031, 65.54117 |
| Website | svols.pro |
Power and grid
| Grid carbon intensity | 447 g CO₂ per kWh (Russia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 45.6%, nuclear 18.3%, coal 17.7%, hydro 16.7%, oil and other fossil 1%. Clean power: 35.7% |
Climate and water
| Water stress today | Low - Medium (10-20%) (Russia) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Zummer - DataCenter?
The grid in Russia emits about 447 g CO₂ per kWh (2025). Largest sources: gas 45.6%, nuclear 18.3%, coal 17.7%.
Who operates Zummer - DataCenter?
Zummer.
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.