中国移动(广西)数据中心

中国移动(广西)数据中心 is an operational data center in Yongning, China. Our footprint estimate of its power is about 5.9 MW.

Key facts

StatusOperational
Facility power5.9 MW (range 2.4 MW to 15 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 49,109 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 2,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates22.71632, 108.39052

Satellite view

Questions

How much power does 中国移动(广西)数据中心 use?

We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.