中国移动(广西)数据中心
中国移动(广西)数据中心 is an operational data center in Yongning, China. Our footprint estimate of its power is about 5.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.9 MW (range 2.4 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 49,109 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 22.71632, 108.39052 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 中国移动(广西)数据中心 use?
We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.