Yellowstone Data Center
Yellowstone Data Center is an operational data center in Jakarta, Indonesia. Our footprint estimate of its power is about 44 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 44 MW (range 22 MW to 71 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,160 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 19,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -6.21536, 106.83692 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Yellowstone Data Center use?
We estimate the facility power at about 44 MW. Estimate from building footprint, low confidence.
Data centers near Jakarta
- EDGE2 (EG2) - Digital Edge JKT2 - Jakarta 250 m · 30 MW
- Matrix Data Center JK3 (MDC JK3) 625 m
- NEX Datacenter (NEX-JK1) Jakarta 1.3 km
- DCI Indonesia (E1) 1.4 km
- Biznet MegaPOP Jakarta MidPlaza 1.9 km
- PSN Networks 2.1 km
- NTT Indonesia Jakarta 2 2.2 km
- NTT Jakarta 1 Data Center (JKT1) 2.3 km