Vodafone Data Centre
Vodafone Data Centre is an operational data center in Lae, Papua New Guinea. Our footprint estimate of its power is about 0.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 0.9 MW (range 0.4 MW to 1.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 725 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 380 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -6.73744, 146.99057 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Vodafone Data Centre use?
We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.