Verizon Glasgow GLSGGB
Verizon Glasgow GLSGGB is an operational data center in Glasgow, United Kingdom. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 13 MW (range 6.5 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,166 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 55.85835, -4.26911 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Verizon Glasgow GLSGGB use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
Data centers near Glasgow
- DataVita DV2 Glasgow 431 m
- iomart DC1 Glasgow 1.2 km · 1.1 MW
- Asanti Hamilton 13.6 km · 7 MW
- DataVita DV1 Lanarkshire 19.9 km · 7 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.