Data Center Directory

Urbacon Data Centre

Urbacon Data Centre is an operational data center in Mount Olive-Silverstone-Jamestown, Canada. Our footprint estimate of its power is about 24 MW.

Key facts

StatusOperational
Facility power24 MW (range 12 MW to 39 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 20,364 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 10,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates43.74070, -79.62090

Satellite view

Questions

How much power does Urbacon Data Centre use?

We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.

Data centers near Mount Olive-Silverstone-Jamestown

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.