Urbacon Data Centre
Urbacon Data Centre is an operational data center in Mount Olive-Silverstone-Jamestown, Canada. Our footprint estimate of its power is about 24 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 24 MW (range 12 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 20,364 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 10,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 43.74070, -79.62090 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Urbacon Data Centre use?
We estimate the facility power at about 24 MW. Estimate from building footprint, low confidence.
Data centers near Mount Olive-Silverstone-Jamestown
- CentriLogic Tranmere (TME) 7.3 km
- Digital Realty YYZ11 Toronto (1 Century) 7.4 km
- Serverfarm TOR1 Toronto 7.6 km
- Digital Realty Toronto YYZ11 7.7 km · 69 MW
- Equinix TR7 - Toronto, Brampton (formerly Q9 Brampton 4/5) 7.8 km · 47 MW
- Cogent Mississauga 8.6 km
- Hut 8 GTA2 9.7 km
- Hut 8 GTA1 11.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.