Torquay Cable Landing Station
Torquay Cable Landing Station is an operational data center operated by SUBCO in Torquay, Australia. Our footprint estimate of its power is about 0.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | SUBCO |
| Facility power | 0.5 MW (range 0.3 MW to 0.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 454 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 210 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Baines Crescent 33 |
| Coordinates | -38.32744, 144.31287 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Torquay Cable Landing Station use?
We estimate the facility power at about 0.5 MW. Estimate from building footprint, low confidence.
Who operates Torquay Cable Landing Station?
SUBCO.
Data centers near Torquay
- Amazon Web Services 66.8 km · 14 MW
- CDC Laverton 67.5 km · 9.9 MW
- Microsoft MEL11 67.9 km · 19 MW
- Stack Infrastructure MEL01A 68.1 km · 11 MW
- AirTrunk data center in Derrimut 71.1 km · 15 MW
- AirTrunk MEL1 71.1 km · 10 MW
- Equinix ME4 - Melbourne, Derrimut (formerly Metronode Melbourne 2) 72.8 km · 8.3 MW
- Digital Realty MEL11 - Melbourne 73.1 km · 3.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.