Data Center Directory

Torquay Cable Landing Station

Torquay Cable Landing Station is an operational data center operated by SUBCO in Torquay, Australia. Our footprint estimate of its power is about 0.5 MW.

Key facts

StatusOperational
OperatorSUBCO
Facility power0.5 MW (range 0.3 MW to 0.9 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 454 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 210 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressBaines Crescent 33
Coordinates-38.32744, 144.31287

Satellite view

Questions

How much power does Torquay Cable Landing Station use?

We estimate the facility power at about 0.5 MW. Estimate from building footprint, low confidence.

Who operates Torquay Cable Landing Station?

SUBCO.

Data centers near Torquay

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.