TLCWEB DC IT1
TLCWEB DC IT1 is an operational data center operated by Intendo S.r.l. in Lamezia Terme, Italy. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Intendo S.r.l. |
| Networks | 2 networks PeeringDB. |
| Address | Via Coschi, 11 |
| Coordinates | 38.95516, 16.28542 |
| Website | tlcweb.it |
Power and grid
| Grid carbon intensity | 285 g CO₂ per kWh (Italy, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 47.4%, solar 16.8%, hydro 15.7%, wind 8.1%, bioenergy 5.9%. Clean power: 48.7% |
| Industrial power price | EUR 0.173 per kWh (Italy, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Water stress today | Extremely High (>80%) (Calabria) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for TLCWEB DC IT1?
The grid in Italy emits about 285 g CO₂ per kWh (2025). Largest sources: gas 47.4%, solar 16.8%, hydro 15.7%.
Who operates TLCWEB DC IT1?
Intendo S.r.l..
Data centers near Lamezia Terme
- Keliweb DC2 45.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.