TI Sparkle Greece (IDC)
TI Sparkle Greece (IDC) is an operational data center operated by TI Sparkle Greece in Metamorfosi, Greece. Our footprint estimate of its power is about 2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TI Sparkle Greece |
| Facility power | 2 MW (range 1 MW to 3.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,633 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 850 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 37 networks, 5 internet exchanges PeeringDB. |
| Also known as | Med Nautilus |
| Address | Ermou 37 |
| Coordinates | 38.07249, 23.77406 |
| Website | tisparkle.com/greece |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TI Sparkle Greece (IDC) use?
We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.
Who operates TI Sparkle Greece (IDC)?
TI Sparkle Greece.
Data centers near Metamorfosi
- Lancom Athens DC 4.4 km
- Cloud Module 1 4.5 km
- Data center in Kryonéri 9.5 km
- Εθνικό Ίδρυμα Ερευνών / National Hellenic Research Foundation (EIE/NHRF) 11.3 km
- Digital Realty ATH1/2/3 - Athens 23.9 km · 3.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.