Data Center Directory

Telus

Telus is an operational data center in East York, Canada. Our footprint estimate of its power is about 6.8 MW.

Key facts

StatusOperational
Facility power6.8 MW (range 3.4 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,649 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressLaird Drive 73, East York
Coordinates43.70501, -79.36053

Satellite view

Questions

How much power does Telus use?

We estimate the facility power at about 6.8 MW. Estimate from building footprint, low confidence.

Data centers near East York