Telus
Telus is an operational data center in East York, Canada. Our footprint estimate of its power is about 6.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.8 MW (range 3.4 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,649 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Laird Drive 73, East York |
| Coordinates | 43.70501, -79.36053 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telus use?
We estimate the facility power at about 6.8 MW. Estimate from building footprint, low confidence.
Data centers near East York
- Level(3) Toronto 3.3 km
- Equinix TR2 - Toronto 6.0 km · 30 MW
- eStruxture TOR-2 6.7 km
- Equinix TR4 - Toronto (formerly Q9 Toronto 2/3/4) 6.7 km
- CentriLogic York (YOR) 6.8 km
- Equinix TR1 - Toronto 7.0 km · 35 MW
- 1YongeColo 7.0 km
- Telehouse Toronto (250 Front St West) 7.1 km