Telmex
Telmex is an operational data center in Gustavo Adolfo Madero, Mexico. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1 MW (range 0.5 MW to 1.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 807 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 19.49060, -99.05474 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Telmex use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
Data centers near Gustavo Adolfo Madero
- ATC Edge CDMX/E2 9.8 km
- Centro Control de Energía 11.7 km
- Triara Mexico City 14.4 km
- ATC Edge CDMX/E1 17.4 km
- Centro de datos KIO MEX5 18.2 km · 23 MW
- KIO México 5 (MEX5) 18.4 km
- KIO México 2 (MEX2) 24.5 km
- KIO México 4 (MEX4) 25.1 km · 0.7 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.