Data Center Directory

Telecom

Telecom is an operational data center in La Falda, Argentina. Our footprint estimate of its power is about 1.1 MW.

Key facts

StatusOperational
Facility power1.1 MW (range 0.6 MW to 1.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 941 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 470 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-31.09453, -64.48712

Satellite view

Questions

How much power does Telecom use?

We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.

Data centers near La Falda

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.