TELECOM is an operational data center in El Carmen de Bolívar, Colombia. Our footprint estimate of its power is about 0.9 MW.

Key facts

StatusOperational
Facility power0.9 MW (range 0.4 MW to 1.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 724 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 380 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates9.71563, -75.12202

Satellite view

Questions

How much power does TELECOM use?

We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.