Surrey Data Park is an operational data center in Godalming, United Kingdom. Our footprint estimate of its power is about 3.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.3 MW (range 1.7 MW to 5.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,751 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.18643, -0.60200 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Surrey Data Park use?
We estimate the facility power at about 3.3 MW. Estimate from building footprint, low confidence.
Data centers near Godalming
- Navisite Woking UK 15.3 km
- Digital Realty London LGW14 15.3 km · 34 MW
- Datum 16.8 km
- Datum Farnborough Data Centre 17.1 km · 13 MW
- Ark Data Centres data center in Fleet 17.2 km · 17 MW
- Asanti - Farnborough 17.6 km
- 4D Surrey 19.8 km · 1 MW
- Gravity Edge LDN1 19.9 km · 37 MW