Stellium Newcastle Campus
Stellium Newcastle Campus is an operational data center in Wallsend, United Kingdom. Our footprint estimate of its power is about 4.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.3 MW (range 1.7 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 36,225 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Cobalt Park Way 9, NE28 9EJ, Wallsend |
| Coordinates | 55.01713, -1.50393 |
| Website | stelliumdc.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Stellium Newcastle Campus use?
We estimate the facility power at about 4.3 MW. Estimate from building footprint, low confidence.
Data centers near Wallsend
- Stellium 1 246 m
- Pulsant Newcastle NE-1 (Central) 8.0 km
- Reliance House 10.3 km
- DXC Wynyard Data Center 44.5 km · 34 MW
- Lumen Technologies data center in Middlesbrough 51.7 km
- Pulsant data center in Stockton-on-Tees 53.2 km
- Data center in Redcar 56.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.