SAP Building 13

SAP Building 13 is an operational data center in St. Leon-Rot, Germany. Our footprint estimate of its power is about 19 MW.

Key facts

StatusOperational
Facility power19 MW (range 9.6 MW to 31 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,021 m² building outline x 4 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSAP-Allee 19, 68789, St. Leon-Rot
Coordinates49.24051, 8.64362

Satellite view

Questions

How much power does SAP Building 13 use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.