Santander data center in Enderby
Santander data center in Enderby is an operational data center operated by Santander in Enderby, United Kingdom. Our footprint estimate of its power is about 8.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Santander |
| Facility power | 8.8 MW (range 4.4 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,332 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 52.58338, -1.20898 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Santander data center in Enderby use?
We estimate the facility power at about 8.8 MW. Estimate from building footprint, low confidence.
Who operates Santander data center in Enderby?
Santander.
Data centers near Enderby
- Santander data center in Narborough 457 m · 7.7 MW
- Santander data center in Narborough 505 m · 7.6 MW
- Data center in Hinckley 12.6 km
- UK Servers Coventry 32.4 km
- Servacus DC02 32.8 km
- Experian 33.2 km · 13 MW
- CWCS DCN3 38.2 km
- The Horizon Centre 38.8 km · 21 MW
More Santander data centers
- Santander data center in Narborough United Kingdom
- Santander data center in Narborough United Kingdom