Rio AI City
Rio AI City is an operational data center in Barra da Tijuca, Brazil. Our footprint estimate of its power is about 69 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 69 MW (range 27 MW to 171 MW) Estimate from building footprint, low confidence. Footprint estimate: about 571,537 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 29,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | -22.96606, -43.37629 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Rio AI City use?
We estimate the facility power at about 69 MW. Estimate from building footprint, low confidence.
Data centers near Barra da Tijuca
- NDX NET Servicos de Informatica 4.2 km
- Takoda RJ01 5.9 km
- Data center in Barra da Tijuca 7.1 km · 4.6 MW
- Tecto TGIG1 (ex Globenet CLS RJ) 7.6 km
- Nextel MSO RJO 10.2 km
- NEXUS RJ01 14.4 km
- Equinix RJ2 - Rio de Janeiro 15.0 km · 11 MW
- Moebius Datacenter 16.2 km
Sources
Correct this page or get the data