Rechenzentrum Garching
Rechenzentrum Garching is an operational data center operated by Max-Planck Computing & Data Facility in Garching, Germany. Our footprint estimate of its power is about 1.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Max-Planck Computing & Data Facility |
| Facility power | 1.6 MW (range 0.8 MW to 2.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,332 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 680 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 1960 |
| Coordinates | 48.26275, 11.67308 |
| Website | mpcdf.mpg.de |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Rechenzentrum Garching use?
We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.
Who operates Rechenzentrum Garching?
Max-Planck Computing & Data Facility.
Data centers near Garching
- Max-Planck-Gesellschaft Raven 137 m · 0.7 MW
- LRZ SuperMUC-NG 498 m · 19 MW
- EXA Edge DC Garching 4.6 km
- nLighten Munich MUC1 4.6 km
- Data center in Unterföhring 6.1 km · 2.3 MW
- NTT Munich 2 Data Center (MUC2) 8.1 km
- EMC Home of Data MUC I/II - MuCon-X 9.6 km
- Arelion Munich MCN 10.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.