Raxio UG1

Raxio UG1 is an operational data center in Bweyogerere, Uganda. Our footprint estimate of its power is about 3.9 MW.

Key facts

StatusOperational
Facility power3.9 MW (range 1.9 MW to 6.2 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,232 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates0.34701, 32.68973
Websiteraxiogroup.com/locations/uganda

Satellite view

Questions

How much power does Raxio UG1 use?

We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.