Raxio CIV1
Raxio CIV1 is an operational data center operated by Raxio in Grand-Bassam, Côte d’Ivoire. Our footprint estimate of its power is about 4.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Raxio |
| Facility power | 4.4 MW (range 2.2 MW to 7.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,698 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 5.22771, -3.75915 |
| Website | raxiogroup.com/locations/ivory-coast |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Raxio CIV1 use?
We estimate the facility power at about 4.4 MW. Estimate from building footprint, low confidence.
Who operates Raxio CIV1?
Raxio.
Data centers near Grand-Bassam
- Equinix AB1 - Abidjan 330 m
- PAIX Abidjan 27.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.