Prime Data Centers - Saeby Campus AAL01
Prime Data Centers - Saeby Campus AAL01 is an operational data center operated by Prime Data Centers in Sæby, Denmark. Our footprint estimate of its power is about 3.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Prime Data Centers |
| Facility power | 3.2 MW (range 1.6 MW to 5.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,653 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 57.31865, 10.50074 |
| Website | primedatacenters.com/locations/saeby |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Prime Data Centers - Saeby Campus AAL01 use?
We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.
Who operates Prime Data Centers - Saeby Campus AAL01?
Prime Data Centers.
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.