Positive Park
Positive Park is an operational data center operated by Positive Internet in March, United Kingdom. Our footprint estimate of its power is about 0.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Positive Internet |
| Facility power | 0.9 MW (range 0.4 MW to 1.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 734 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 380 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 52.58375, 0.05651 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Positive Park use?
We estimate the facility power at about 0.9 MW. Estimate from building footprint, low confidence.
Who operates Positive Park?
Positive Internet.
Data centers near March
- Data center in Peterborough 21.8 km · 4.9 MW
- EXA Edge DC Peterborough 22.0 km
- MyHostingSpace - Peterborough 30.4 km
- Fast2host - Fast4networks Ltd 32.9 km
- US Air Force data center in Brandon 39.2 km · 0.8 MW
- Redcentric Cambridge 39.8 km
- West Cambridge Data Centre 41.7 km · 1.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.