Pi Datacenters Amaravati
Pi Datacenters Amaravati is an operational data center operated by Pi Datacenters Pvt in Amaravati, India. Our footprint estimate of its power is about 9.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Pi Datacenters Pvt |
| Facility power | 9.3 MW (range 4.7 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,752 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks, 1 internet exchanges PeeringDB. |
| Address | Survey # 49/P, Plot no 12, IT Park, Mangalagiri, Guntur (Dist.) |
| Coordinates | 16.42107, 80.55841 |
| Website | pidatacenters.com |
Power and grid
| Grid carbon intensity | 666 g CO₂ per kWh (India, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 70%, solar 9.8%, hydro 8.5%, wind 5%, nuclear 2.6%. Clean power: 27.1% |
Climate and water
| Water stress today | Extremely High (>80%) (Andhra Pradesh) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Pi Datacenters Amaravati use?
We estimate the facility power at about 9.3 MW. Estimate from building footprint, low confidence.
How clean is the power for Pi Datacenters Amaravati?
The grid in India emits about 666 g CO₂ per kWh (2025). Largest sources: coal 70%, solar 9.8%, hydro 8.5%.
Who operates Pi Datacenters Amaravati?
Pi Datacenters Pvt.
Data centers near Amaravati
- XConnect Amaravati IDC 2.0 km
- SIFY CVR Chambers Vijayawada 12.8 km
- Fastcom DC Facility - 1 13.2 km
- City Online Services Ltd, Vijayawada 13.5 km
- Myguru Vijayawada 15.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.