Data Center Directory

Ovio

Ovio is an operational data center operated by GNC-Alfa in Աբովյան, Armenia. Our footprint estimate of its power is about 1.6 MW.

Key facts

StatusOperational
OperatorGNC-Alfa
Facility power1.6 MW (range 0.8 MW to 2.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,299 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 680 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressԿարմիր Բանակի փողոց 7, Աբովյան
Coordinates40.26963, 44.61480

Satellite view

Questions

How much power does Ovio use?

We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.

Who operates Ovio?

GNC-Alfa.

Data centers near Աբովյան

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.