Ovio
Ovio is an operational data center operated by GNC-Alfa in Աբովյան, Armenia. Our footprint estimate of its power is about 1.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | GNC-Alfa |
| Facility power | 1.6 MW (range 0.8 MW to 2.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,299 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 680 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Կարմիր Բանակի փողոց 7, Աբովյան |
| Coordinates | 40.26963, 44.61480 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Ovio use?
We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.
Who operates Ovio?
GNC-Alfa.
Data centers near Աբովյան
- AIC 12.1 km
- Viva Kochar 13.0 km
- REG.AM 13.3 km
- GNC-Alfa Yerevan 13.5 km
- Viva Argishti 14.3 km
- Viva Karekin_Njdeh 17.3 km
- Yotta Network LLC 26.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.