OPCORE DC6-2
OPCORE DC6-2 is an operational data center operated by OPCORE in Saint-Ouen-l'Aumône, France. Our footprint estimate of its power is about 12 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | OPCORE |
| Facility power | 12 MW (range 6.1 MW to 20 MW) Estimate from building footprint, low confidence. Footprint estimate: about 10,171 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 49.03015, 2.12014 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does OPCORE DC6-2 use?
We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.
Who operates OPCORE DC6-2?
OPCORE.
Data centers near Saint-Ouen-l'Aumône
- OPCORE DC6-6 401 m · 11 MW
- OPCORE DC6-5 593 m · 30 MW
- OPCORE - DC5 / PAR5 2.9 km · 10 MW
- Datacenter des Douanes 4.7 km · 2.7 MW
- Site technique SFR 7.2 km · 4.8 MW
- Datacenter Bouygues Télécom 8.4 km · 1.2 MW
- MENGINE 10.8 km
- OPCORE DC1 13.9 km · 12 MW
More OPCORE data centers
- OPCORE DC6-5 France
- OPCORE - DC3 / PAR3 France
- OPCORE DC1 France
- OPCORE DC6-6 France
- OPCORE - DC5 / PAR5 France
- OPCORE - DC2 / PAR2 France
- OPCORE - DC4 / PAR4 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.