Oi

Oi is an operational data center in Paranaguá, Brazil. Our footprint estimate of its power is about 2.2 MW.

Key facts

StatusOperational
Facility power2.2 MW (range 1.1 MW to 3.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,824 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 940 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates-25.54938, -48.54699

Satellite view

Questions

How much power does Oi use?

We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.

Data centers near Paranaguá

Sources