Odata Data Center is an operational data center in Quilicura, Chile. Our footprint estimate of its power is about 5.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.3 MW (range 2.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 44,230 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Avenida Presidente Eduardo Frei Montalva 17400 |
| Coordinates | -33.30746, -70.72870 |
| Website | odatacolocation.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Odata Data Center use?
We estimate the facility power at about 5.3 MW. Estimate from building footprint, low confidence.
Data centers near Quilicura
- EdgeConneX Santiago (EDCSCL01) 2.8 km
- Campus Santiago Ascenty Data Center 3.8 km · 11 MW
- Ascenty SCL02 - Santiago 4.0 km
- Ascenty SCL01 - Santiago 4.0 km
- Microsoft Data Center 4.5 km · 11 MW
- SONDA - Quilicura 6.1 km · 2.1 MW
- Google Data Center 6.5 km · 18 MW
- Datacenter Claro - Liray 7.2 km · 12 MW