NSC Berzelius
NSC Berzelius is an operational AI data center operated by Linköping University in Linköping, Sweden. Its power is about 0.6 MW. Epoch AI estimates about 237 H100-equivalent AI chips (NVIDIA A100 SXM4 40 GB, NVIDIA A100 SXM4 80 GB).
Key facts
| Status | Operational |
|---|---|
| Operator | Linköping University |
| Facility power | 0.6 MW Reported (Epoch AI or owner data) |
| AI compute | 237 H100-equivalents |
| AI chips | NVIDIA A100 SXM4 40 GB, NVIDIA A100 SXM4 80 GB Reported (Epoch AI or owner data) |
| Chip count | 752 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 270 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | 583 30 Linköping, Sweden |
| Coordinates | 58.39429, 15.56106 |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| NSC Berzelius Phase 1 | NVIDIA A100 SXM4 40 GB | 480 | 0.4 MW | 2021-03-23 |
| NSC Berzelius Phase 2 | NVIDIA A100 SXM4 80 GB | 752 | 0.6 MW | 2023-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NSC Berzelius use?
Public data puts the facility power at about 0.6 MW. Reported (Epoch AI or owner data).
What chips does NSC Berzelius use?
Reported chips: NVIDIA A100 SXM4 40 GB, NVIDIA A100 SXM4 80 GB.
Who operates NSC Berzelius?
Linköping University.
Data centers near Linköping
- IP-Only data center in Linköping 547 m · 5 MW
- AWS eu-north-1 Availability Zone K 77.5 km · 24 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.