NorthC Münchenstein (Basel) 1
NorthC Münchenstein (Basel) 1 is an operational data center operated by NorthC Schweiz in Münchenstein, Switzerland. Our footprint estimate of its power is about 0.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | NorthC Schweiz |
| Facility power | 0.7 MW (range 0.3 MW to 1.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,433 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 7 networks PeeringDB. |
| Also known as | NorthC data centers Basel |
| Address | Weidenstrasse 41 |
| Coordinates | 47.51250, 7.61544 |
| Website | northcdatacenters.com/ch-de |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NorthC Münchenstein (Basel) 1 use?
We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.
Who operates NorthC Münchenstein (Basel) 1?
NorthC Schweiz.
Data centers near Münchenstein
- NorthC Münchenstein (Basel) 2 288 m
- Klixa Muttenz 3.5 km
- IWB Datacenter Basel 4.5 km
- Colobâle 4.6 km
- Microsoft 27.5 km
- data11 35.2 km
- Kom4Tel GmbH 43.0 km
- Green Datacenter ZRH1 (fka: Green Lupfig) 45.4 km · 7.8 MW
More NorthC Schweiz data centers
- NorthC Biel (Bern) Switzerland
- NorthC Münchenstein (Basel) 2 Switzerland
- NorthC Winterthur (Zürich) Switzerland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.