中国联通宁波分公司总部
中国联通宁波分公司总部 is an operational data center in Ningbo, China. Our footprint estimate of its power is about 4.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.4 MW (range 1.8 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 36,774 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 29.87726, 121.63227 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 中国联通宁波分公司总部 use?
We estimate the facility power at about 4.4 MW. Estimate from building footprint, low confidence.
Data centers near Ningbo
- NyanLoli Network - NBDC 1.4 km
- Data center in Ningbo 15.1 km · 171 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.