NHN data center in Chuncheon is an operational data center operated by NHN in Chuncheon, South Korea. Our footprint estimate of its power is about 26 MW.

Key facts

StatusOperational
OperatorNHN
Facility power26 MW (range 13 MW to 42 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 21,908 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 11,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known as네이버데이터센터 각
Coordinates37.88926, 127.77360

Satellite view

Questions

How much power does NHN data center in Chuncheon use?

We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.

Who operates NHN data center in Chuncheon?

NHN.