Data Center Directory

Nextstream Data Center

Nextstream Data Center is an operational data center in Ñuñoa, Chile. Our footprint estimate of its power is about 2.7 MW.

Key facts

StatusOperational
Facility power2.7 MW (range 1.3 MW to 4.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,214 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressAvenida Apoquindo 7071
Coordinates-33.40809, -70.55713

Satellite view

Questions

How much power does Nextstream Data Center use?

We estimate the facility power at about 2.7 MW. Estimate from building footprint, low confidence.

Data centers near Ñuñoa

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.