MTN Ghana Tetteh Quarshie Switch Center
MTN Ghana Tetteh Quarshie Switch Center is an operational data center in Medina Estates, Ghana. Our footprint estimate of its power is about 1.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1.6 MW (range 0.6 MW to 3.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,065 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 680 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 5.62582, -0.18140 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does MTN Ghana Tetteh Quarshie Switch Center use?
We estimate the facility power at about 1.6 MW. Estimate from building footprint, low confidence.
Data centers near Medina Estates
- ONIX Data Centre Accra 2.7 km
- K-Net Accra 3.2 km
- PAIX Accra 6.4 km
- National Data Centre 8.4 km
- IS Internet Solutions Ghana 8.4 km
- Digital Realty ACR2 - Accra 9.7 km
- Equinix AC1 - Accra 21.9 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.